Heat Energy
Solutions for heating, economy of heating, and heating water.
DCa THERM, a.s
and associated companies dealing with comprehensive streamlining of heat production and distribution offer:
- consultancy
- complete examination of state of heating system
- solution survey
- project design for building permission and construction
- connections for energies – natural gas, electricity, drinking water, heating and hot water distribution
- comprehensive supplies of boiler plants, heat exchangers for central heating and water heating
- instrumentation installation
- financing and building approval
- hydraulic regulation of operational heating and hot water distribution systems
- monitoring of heat production efficiency, technical assistance for operation and maintenance of heat devices pursuant to law No 657/2004
We also offer
- manufacturing, distribution and supply of heat and hot water under licence (licence No T2005T0030)
- repairs and maintenance of boiler plant equipment
- inspections and testing of pressure vessels
- installation and reparations of instrumentation
- installation and reparations of regulation devices
- installation, service and regulation of infrared heaters (natural gas, propane-butane)
- operation of heat devices (local or remote)
- chemical treatment of water
- funding of renovations and upgrading of heat devices and distribution systems
- heat price calculation – following the methodology of the URSO (state agency for regulation of network-distributed energies)
- monitoring of real expenses in heat production following the methodology of the URSO and laws in force
- chemical cleaning of central heating and hot water equipment and distribution systems
OSBD Považská Bystrica – boiler plant Ladce
Reconstruction of exchanger assembly into a gas boiler plant – project design, realization, output 2.5 MW, boilers Primatik
Regional Authority Trenčín
Renovation of a gas boiler plant – project design, building permission, realization, official approval, output 1.85 MW – boilers FROLING
VÚB Trenčín
Renovation of a gas boiler plant - project design, building permission, realization, official approval, output 0.5 MW – boilers BUDERUS
Renovation of heating system – complete replacement of heaters Korád and of distribution system – plastic pipes Gabotherm
OZETA Zlatníky
Reconstruction of coal boiler plant into a gas boiler plant – installation of instrumentation – project design, realization
SBD, KINEX, TEZAR Bytča
Application of thermostats in 27 buildings /approx. 3 850 valves/
POV BYT Považská Bystrica
Application of thermostats in 28 buildings /approx. 5 250 valves/ Regulation of 13 external circuits of central heating and hot water
Dubnica nad Váhom
Reconstruction of coal boiler plant into a gas boiler plant - project design, realization, funding, output 0.2 MW – boilers RAPIDO
OSBD Považská Bystrica - stredisko Dubnica nad Váhom
Reconstruction of coal boiler plants into a gas boiler plants (3 buildings), output 3 x 0.2 MW – boilers RAPIDO
SAD Prievidza
3 gas boiler plants – project design, realization, output 0.6 MW, boilers WOLF and RAPIDO
NOMA Trenčín, a.s. Trenčín
Renovation of boiler feed and water treatment assembly in a gas boiler plant
KIA SLOVAKIA Žilina
Supply of boilers for a training centre
ZUŠ Dubnica nad Váhom
Reconstruction of coal boiler plant into a gas boiler plant – 015 MW and application of thermostats in a building
Town Hall Dubnica nad Váhom
Renovation of a gas boiler plant (condensation system WOLF) – 0.2 MW
Library Dubnica nad Váhom
Renovation of a gas boiler plant (condensation system WOLF) – 0.2 MW
Sports Centre Dubnica nad Váhom
Exchangers of central heating and hot water in the centre, including instrumentation – output 0.5 MW
Reconstruction of exchanger assembly into a gas boiler plant – project design, realization, output 2.5 MW, boilers Primatik
Regional Authority Trenčín
Renovation of a gas boiler plant – project design, building permission, realization, official approval, output 1.85 MW – boilers FROLING
VÚB Trenčín
Renovation of a gas boiler plant - project design, building permission, realization, official approval, output 0.5 MW – boilers BUDERUS
Renovation of heating system – complete replacement of heaters Korád and of distribution system – plastic pipes Gabotherm
OZETA Zlatníky
Reconstruction of coal boiler plant into a gas boiler plant – installation of instrumentation – project design, realization
SBD, KINEX, TEZAR Bytča
Application of thermostats in 27 buildings /approx. 3 850 valves/
POV BYT Považská Bystrica
Application of thermostats in 28 buildings /approx. 5 250 valves/ Regulation of 13 external circuits of central heating and hot water
Dubnica nad Váhom
Reconstruction of coal boiler plant into a gas boiler plant - project design, realization, funding, output 0.2 MW – boilers RAPIDO
OSBD Považská Bystrica - stredisko Dubnica nad Váhom
Reconstruction of coal boiler plants into a gas boiler plants (3 buildings), output 3 x 0.2 MW – boilers RAPIDO
SAD Prievidza
3 gas boiler plants – project design, realization, output 0.6 MW, boilers WOLF and RAPIDO
NOMA Trenčín, a.s. Trenčín
Renovation of boiler feed and water treatment assembly in a gas boiler plant
KIA SLOVAKIA Žilina
Supply of boilers for a training centre
ZUŠ Dubnica nad Váhom
Reconstruction of coal boiler plant into a gas boiler plant – 015 MW and application of thermostats in a building
Town Hall Dubnica nad Váhom
Renovation of a gas boiler plant (condensation system WOLF) – 0.2 MW
Library Dubnica nad Váhom
Renovation of a gas boiler plant (condensation system WOLF) – 0.2 MW
Sports Centre Dubnica nad Váhom
Exchangers of central heating and hot water in the centre, including instrumentation – output 0.5 MW